ss-logo

System Capacity Plans

Planning Documents to Address SacSewer System Capacity Needs

System Capacity Plan

In 2020, the System Capacity Plan was updated to be a comprehensive plan that addresses existing and buildout sewer capacity needs based on SacSewer’s current sewer system conditions.

system-capacity-plans

Interceptor Sequencing Study

The Interceptor Sequencing Study is for the largest pipes in our system, called interceptors. The study provides a high level evaluation of interceptor alternatives and identifies interceptor alignment corridors as well as anticipated capacity needs and interceptor pipe sizes.
Secured By miniOrange