Backups Into Structures Rate

General information

Measures the number of times, per 10,000 connections, that a stoppage in SASD’s sewer system causes sewage to backup into a structure within any calendar month. (Plugged fixtures or stoppages within building plumbing are not considered a backup into structure.)

Target: 0.64

A set value of 0.64 events per 10,000 connections to our system. This target reduces each year.

Log in

Commands