2008 PERFORMANCE = 96%
Measures how frequently staff arrives on-time while responding to a customer service request call.
TARGET = 95%
Staff will arrive onsite within two hours of a customer service request call for 95% of all service calls occurring within any calendar month.
Service Restoration Time
84%
Service Restoration Time
2008 PERFORMANCE = 84%
Measures the amount of time you are without sewer service
or are asked to limit your use.
TARGET = 90%
Service will be restored within four hours of receiving the
customer call for 90% of all interruptions occurring within any
calendar month.
Customer Satisfaction
97%
Customer Satisfaction
2008 PERFORMANCE = 97%
Measures the percentage of positive responses by customers
in an anonymous survey mailed after each time we respond
to a service call.
TARGET = 90%
Of those responding to the anonymous survey, 90% will rate
the service they received as "good" or "excellent".
Development Submittal Review Time
95%
Development Submittal Review Time
2008 PERFORMANCE = 95%
Measures the percentage of development submittals we
review and return to the developer with District-adopted
time standards.
TARGET = 90%
Staff will return comments within the adopted time standards
for 90% of all complete developer submittals within any
calendar month.
Main Line Overflow Rate
0.55
Main Line Overflow Rate
2008 PERFORMANCE = .55
Measures the number of sewer overflows originating
within the District’s system per 100 miles of sewer main lines.
TARGET = .40
The District’s target is a 15% reduction from 2007 or .40
sewer overflows per 100 miles of sewer main lines.
Lower Lateral Overflow Rate
8.90
Lower Lateral Overflow Rate
2008 PERFORMANCE = 8.9
Measures the number of sewer overflows originating
within the District’s system per 100 miles of sewer lower
lateral lines.
TARGET = 5.7
The District’s target is a 15% reduction from 2007 or 5.7 sewer
overflows per 100 miles of sewer lower lateral lines.
Back-ups Into Stuctures
1.63
Back-ups Into Structures Rate
2008 PERFORMANCE = 1.63
Measures the number of sewer back-ups into structures (BIS)
per 10,000 connections to our District’s system.
TARGET = 1.03
The District’s target is a 15% reduction from 2007 or 1.03 BIS
events per 10,000 connections to our system