Developer Resources
Contact Us | Sign-Up For Automatic Updates
Standards and Specifications - New for 2011
These standards provide minimum requirements for planning, design, and construction of sewer facilities that are, or will be, dedicated to the District. These standards are meant to ensure the District sewer system is properly engineered to operate in a cost effective manner while protecting the safety and general welfare of the public and District personnel. The District has updated and combined the Design Standards, Construction Specifications, Rehabilitation Standards and Specifications, and Standard Plans into a single document. This document was presented and approved by the Board of Directors on June 22, 2011.
Please send any questions/comments to standardschanges@sacsewer.com or call Gayleen Darting at 916-875-6425.
- 2011 SASD Standards and Specifications v 1.0
(8,137K) - County of Sacramento Construction Standards
- Pump Station Startup Checklist
(71K) - Minimum Geotechnical Program Requirements
(115K) - Minimum Sewer Study Requirements
(167K) - Submittal Requirements
(95K) - Minimum Design Report Requirements
(72K) - Sacramento Area Sewer District AutoCAD Standards – September 2010
(323K) - AutoCAD Border Templates – September 2010
(142K - multiple zipped CAD files) - Approved Manhole Manufacturers
(26K) - Approved TV Contractors
(27K) - Sewer System Capacity Plan 2010 Update
- 2010 SCP Report
- Sections 1-7
(21MB)
- Section 8.1 Appendix A – Expansion Area Trunk Shed Plans
- BR Bond Sheldon
(2,601K) - BR Calvine
(1,688K) - BR East Rancho
(6,242K) - BR Elder Creek
(1,047K) - BR Florin
(1,861K) - BR Gerber
(1,688K) - BR Gravel East
(1,439K) - BR Mather East
(1,810K) - CE Elk Grove Florin
(1,573K) - CE Gravel West
(2,443K) - DRY Rio Linda SE
(1,226K) - FE Folsom
(2,034K) - LA East Franklin
(2,774K) - LA Elk Grove
(2,199K) - LA Laguna Ridge
(2,127K) - NN Greenbriar
(1,328K) - UN Elverta
(1,625K) - UN Orangevale
(1,164K) - UN Rio Linda East
(1,791K) - UN Rio Linda SW
(1,107K) - UN Rio Linda West
(1,413K)
- BR Bond Sheldon
- Section 8.2 Appendix B – Technical Memorandums
- Sections 1-7
- 2010 SCP Executive Summary:
- 2010 SCP Report
Want Immediate Access to Updated District Information?
We thought you might...
The District has added a new feature that allows you to sign up for e-mail updates when new standards, specifications and documents are uploaded. Sign-up with your e-mail address now to get started!
Download Adobe Acrobat
Download Windows Media Player
Please visit our accessibility page if you have problems accessing these files.